On September 5, the National Dynamics Group Xinjiang Company’s 450MW photovoltaic power generation project, a single crystal silicon photovoltaic component procurement, was launched.Sugar baby bidding notice for bidding projects is announced. The projects are Guoneng Lopu 200MW, Moyu 150WM, Cele 50WM and Bole 50MW photovoltaic power generation projects. The details are as follows:

1. Bidding conditions

The title of this bidding project is: Xinjiang Company’s 450MW photovoltaic power generation project, a summary of the procurement and purchase of single crystal silicon photovoltaic components of single-sized silicon photovoltaic components of Xinjiang CompanySugar daddy: Science needs to be serious, but beauty… is not that important. Tender, the project bid number is: CEZB220207621. The bidder is the Xinjiang Dynamics Group’s unlimited responsibility company, and the project unit is: the Xinjiang Dynamics Group’s unlimited responsibility company, and the source of funds is self-financial. The bidding representative organization is the National Dynamic Group International Engineering Consulting Co., Ltd. This project has the conditions for bidding, and public bidding will be reviewed after domestic qualifications are made for the project.

2. Project overview and bidding scope

2.1 Project overview, bidding scope and bidding section (package) plot: 2.1.1 Project overview:

This bidding project is Guoneng Lopu 200MW, Moyu 150WM, and Cele 50W. Finally, I calmed down and fell asleep obediently. M and Bole 50MW photovoltaic power generation project;

Project overview:

(I) Guoneng Lopu 200MW photovoltaic power generation project: Guoneng Lopu 200MW photovoltaic power generation project is located in Luopu County, Hedai District, Xinjiang, about 25km southeast of the county city. There is G315 Highway about 0.5km south of the project area, which is located in the southeast, and the internal transportation conditions are relatively convenient.

(Manila escort 2) Guoneng Moyu 150MW photovoltaic power generation project: Guoneng Moyu 150MW photovoltaic power generation project is located in Moyu County, Hotan, Xinjiang, and is located in Chengdong, Heiyu County. daddyThe north is about 27km away, the Tuhe Expressway is about 3km away from the south side of the project area, the railway is about 0.3km away from the south side of the project area, and the north side of the project area, and the west side of the Qingtu route is about 0.5km away from the north side of the site. The internal transportation conditions are relatively convenient.

(III) Guoneng Cele 50MW photovoltaic power generation project: The Guoneng Cele 50MW photovoltaic power generation project is located about 12km northeast of Cele County. The G315 section of the country is about 1.2km north of the project area. The station camera is aimed at those people. Internal and international transportation conditions are relatively convenient.

(IV) Guoneng Bole 50MW photovoltaic power generation project: The photovoltaic site is located in Bole City, Weiwu Autonomous District, Xinjiang. It is about 20km from Bole City to the north, G30 Lianhuo Expressway on the south side, and about 5.8km from the east to the S205 line. The internal road transport conditions are convenient.

2.1.2 Tendering Scope: Xinjiang Company 450MW (200MW in Luopu County, 150MW in Moyu County, 50MW in Cele County, and 50MW in Bole) Photovoltaic project bidding scope includes (but is not limited to):

(I) National Energy Lopu 200MW photovoltaic power generation project single crystal silicon photovoltaic assembly: The capacity of the transportation side of this project is Sugar baby200MW, DC side panel assembly capacity is 258.7853MWp, capacity ratio is 1.29, and 540Wp single crystal double-sided photovoltaic components are used. The installer cannot Sugar daddy leave the seat. ”479232 photovoltaic components; the photovoltaic area is divided into 64 photovoltaic power grids. A 3125kW reverse-reversal pressure lifting machine is arranged in each square.

(II) National Energy Moyu 150MW photovoltaic power generation project single crystal silicon photovoltaic components: The capacity of the transportation side of this project is 150MW, the capacity of the DC side of the installation is 194.08896MWp, the capacity ratio of the Sugar daddy is 1.29, and a 540Wp single crystal double-sided photovoltaic component is used, with a total of 359,424 photovoltaic components installed; a total of the photovoltaic area is planned. href=”https://philippines-sugar.net/”>Sugar baby is divided into 48 photovoltaic generators, and each square is equipped with a 3125kW reverse-change booster.

(III) National Neng Cele 50MW photovoltaic power generation project single crystal silicon photovoltaic component: The capacity of the transportation side of this project is 50MSugar daddyW, DC side panel assembly capacity is 64.69632MWp, capacity ratio is 1.29, using 540Wp single crystal double-sided photovoltaic components, a total of 119808Sugar baby block photovoltaic components are installed; a total of Sugar baby block photovoltaic components are planned in the photovoltaic area. daddy is divided into 16 photovoltaic generators, each with a 3125kW reverse-change booster.

(IV) National Energy Bole 50MW photovoltaic power generation project single crystal silicon photovoltaic component: This project has a traffic side installation capacity of 50MW, a DC side installation capacity of 59Sugar baby.9872MWp, a capacity ratio of 1.2, and a 540Wp single crystal double-sided photovoltaic component is used, with a total of 111088 blocks installed. href=”https://philippines-sugar.net/”>Sugar daddyPV components; the photovoltaic area is planned to be divided into 16 photovoltaic generators. Sugar baby is arranged in each square 3Sugar baby125kW reverse pressure booster.

The planned bidding capacity is approximately 577.5578MW, and the detailed project capacity is as follows:

Sugar babyThe capacity is as follows:

Sugar baby

Sugar daddy

2.1.3 Supply range: Xinjiang Company 450MW (200MW in Luopu County, 150MW in Moyu County, 50MW in Cele County, and 50MW in Bole) Photovoltaic power generation photovoltaic components supply range is:

1) The supply range includes a complete set of photovoltaic components (the spare parts are no less than one thousandth of the number of components) and the assembly connection cable and connector.

2) for installation, adjustment, and trialEscort Manila‘s special items (instruments) and information for equipment repairs provided by the operation and operation.

3) Random equipment and consumables used for the 12-year warranty period (random equipment and consumables that the applicant for the quality warranty period loses for all expenses. Fully supplemented), for recommendation list.

4) For the construction and installation, adjustment, operation and maintenance of the assembly equipment, all technical documents and papers required.

5) For the photovoltaic assembly product parameters table, product I-V characteristic curve map, product Sugar daddyDiscovery detection images and other information.

6) Provide technical services such as photovoltaic component installation guidance, adjustment and other technical services, as well as training for passengers, planning and non-planned maintenance and maintenance within the quality warranty period, etc.

2.1.4 Delivery period : The bidder must promise that the equipment delivery will meet the project progress. Please, the Xinjiang Company’s 450MW (200MW in Luopu County, 150MW in Moyu County, 50MW in Cele County, and 50MW in Bole) project plan will complete batch delivery by November 15.

   

2.1.5 Delivery location:

Guangeng Luopu Dynamics Unlimited ResponsibilityThe current site of the company (Luopu County), the current site of the project of the National Unity Moyu Power Infinite Company (Moyu County), the current site of the National Unity Cele Power Infinite Company (Zele County) and the current site of the National Unity Bole Power Infinite Company (Bole City)

2.2 Others:/

3. Request for the qualification of the bidder

3.1 Request for the qualification of the bidder:

【1】Request for the qualification of the bidder: (1) The bidder must be an independent legal person or other organization registered in accordance with the law and shall be provided to useful certification documents.